Search

Documentation

The Electronmash company has manufactured the ExOnSys XL series operational DC system for the needs of the Gryazovetskaya II compressor station

22 March 2019

All news

Gazprom PJSC is a global energy company. To ensure the supply of gas to the starting point of the Nord Stream -2 gas pipeline, Gazprom is implementing the project "Development of gas transmission capacities in the North-Western region", which will provide gas supply to the offshore part of the Nord Stream-2 gas pipeline in the amount of 55 billion m3 per year and to consumers in the North-Western region of the Russian Federation.

To provide direct current power to responsible consumers at the Gryazovetskaya II compressor station, JSC Electronmash has manufactured the ExOnSys XL series for a rated current of 1000 A. The direct current system includes a control panel, two working and one backup sound and two sets of rechargeable batteries. Is made in strict accordance with the industry requirements of Gazprom PJSC.

"ExOnSys" is equipped with a monitoring system with functions for monitoring the isolation of sections and outgoing lines, the level of voltage fluctuations, the level of charge/discharge of batteries, the asymmetry of batteries, and the condition of switching devices. Access to the monitoring system is possible from the local visualization panel located on the facade of the control panel, as well as remotely from the control panel.

Electronmash appreciates the trust placed by Gazprom in the supply of high-quality and reliable equipment for the power supply of critical facilities in the oil and gas industry.

All news

Related materials

21 September 2021 Product
DC switchboards «ELM»
27 July 2021 Product
DC System «ExOnSys»