In 2023, JSC Electronmash performed general contracting services for JSC NovaVind for the construction of an electric grid complex to ensure the supply of power and electricity from Kuzminskaya WPP in the Stavropol Territory with a total installed capacity of 160 MW. The planned average annual electric power generation of the Kuzminskaya wind farm is 457,760 MWH/year. h.
The company JSC "Electronmash" has completed a full range of works, including:
- manufacture and comprehensive supply of equipment for a 110 kV Outdoor switchgear, a 35 kV Outdoor switchgearcombined with a wind turbine power plant;
- preparation and organization of the construction site; a complex of works according to the master plan (including vertical layout, landscaping and reclamation of the area, etc.);
- a complex of general construction works at the 35/110 kV substation;
- the complex of electrical installation works on substation 35/110 kV;
- installation and commissioning of relay protection and automation devices;
- comprehensive commissioning works for a 110 kV Outdoor switchgear, a 35 kV ORU combined with a wind turbine power plant.
We would like to thank JSC Electronmash for manufacturing high-quality electrical equipment for the 110 kV KTPB-ELM-110-5H/35-2×80000-2-21, performing construction, installation and commissioning work in a short time and in full compliance with the project.
It should be noted that despite the difficult situation with the supply of imported equipment, in August-November 2022, Electronmash JSC was able to implement the design and engineering solutions of the Facility for a 110 kV Outdoor switchgear, a 35 kV MVS, and a DC system in full within the time limits specified by the Contract. The specialists of the operating company highly appreciated the individual approach and organization of the operational technical support provided by the employees of JSC Electronmash during the work at the facility.
The implementation of renewable energy projects creates new jobs, tax revenues to the regional and federal budgets, and increases the stability and reliability of electricity supply. We would like to thank JSC Electronmash for their professionalism and teamwork.
- manufacture and comprehensive supply of equipment for a 110 kV Outdoor switchgear, a 35 kV Outdoor switchgearcombined with a wind turbine power plant;
- preparation and organization of the construction site; a complex of works according to the master plan (including vertical layout, landscaping and reclamation of the area, etc.);
- a complex of general construction works at the 35/110 kV substation;
- the complex of electrical installation works on substation 35/110 kV;
- installation and commissioning of relay protection and automation devices;
- comprehensive commissioning works for a 110 kV Outdoor switchgear, a 35 kV ORU combined with a wind turbine power plant.
We would like to thank JSC Electronmash for manufacturing high-quality electrical equipment for the 110 kV KTPB-ELM-110-5H/35-2×80000-2-21, performing construction, installation and commissioning work in a short time and in full compliance with the project.
It should be noted that despite the difficult situation with the supply of imported equipment, in August-November 2022, Electronmash JSC was able to implement the design and engineering solutions of the Facility for a 110 kV Outdoor switchgear, a 35 kV MVS, and a DC system in full within the time limits specified by the Contract. The specialists of the operating company highly appreciated the individual approach and organization of the operational technical support provided by the employees of JSC Electronmash during the work at the facility.
The implementation of renewable energy projects creates new jobs, tax revenues to the regional and federal budgets, and increases the stability and reliability of electricity supply. We would like to thank JSC Electronmash for their professionalism and teamwork.