Search

Documentation

JSC Electronmash supplied 35/6 kV substations with a capacity of 2 x 4000 kVA for the power supply of bush No. 15 of the Suzunskoye field of PJSC NK-Rosneft.

14 September 2018

All news

Taking into account the importance of timely commissioning of the new bush of the Suzunskoye field, the specialists of JSC Electronmash completed the development of design documentation in a short time and manufactured a 35/6 kV PS.

To ensure the minimum time for commissioning the substation in the harsh climate of the Arctic, all PS distribution equipment was housed in compact, quick-to-assemble modular buildings with high factory readiness, specially designed for operation at low temperatures.

The substation is equipped with modern 6 kV "ELTEMA" and 35 kV "ELTEMA+" RCUs, an operational DC system "ExOnSys"

PS 35/6 kV for bush No. 15 is the fourth substation manufactured by JSC Electronmash for the Suzun oil field of PJSC NK–Rosneft, which confirms the quality and reliability of JSC Electronmash equipment for the oil industry.

All news