Compliance with the requirements of the Russian Maritime Register of Shipping (RMRS)
The company has received a certificate of type approval of the RMRS for the Eltema MVS. The quality control system at the enterprise has been checked, which is recognized as meeting the requirements of the RMRS, and a certificate of compliance with the quality control system of the manufacturer SKK2 has been obtained.
As a result, 50 cells of the Eltema MVS were delivered, fully complying with the requirements of the RMRS, for the D33 deposit in Kaliningrad.

Equipment certification
We have successfully confirmed the certificates of conformity of the INTERGAZSERT at the Eltema MVS, LVS Assol. We have obtained licenses for the right to manufacture and design Eltema MVS for nuclear installations. And we conducted standard tests of the Eltema+ switchgear with a rated current of 3150A.
Electronmash - 25 years of success
Since its foundation, Electronmash has been setting standards for reliability and efficiency. A quarter of a century of experience, innovation and professionalism is what makes us strong.

A systematic approach
We continue to successfully perform the functions of a general contractor thanks to a clear production maintenance system (Total Productive Maintenance). In 2023, our company built and commissioned two more substations in the Stavropol Territory: 110/35 kV Kuzminskaya WPP substation with a capacity of 160 MVA and 110/35 kV Trunovskaya WPP substation with a capacity of 126 MVA.

The monitoring system in the phone
We have developed a modern solution that allows you to use a smartphone as a terminal to receive data on the state of a controlled system: from individual nodes within the MVS, LVS, Indoor switchgear and control panel to an integrated power supply management system for the entire enterprise or installation.

ESS for Gazpromneft-ONPZ JSC
The company has manufactured and supplied SNES, which includes advanced solutions based on supercapacitors and inverters. We have successfully carried out installation supervision and commissioning of the ESS, ensuring high-quality and timely installation and commissioning of equipment at the facility.

Unique production system
Despite COVID-19, we were able to create a unique engineering and production system on schedule and adapt it to all the challenges of the time. All processes from the development of design documentation to the shipment of finished products are fully automated and standardized, the staff has the highest qualifications, labor productivity and our capabilities allow us to confidently look into our FUTURE.

Information security for our Customers
The new challenges of the time are not only the supply of equipment and its automation, but also the development of sections of the information security project for the supplied equipment of the waterproofing de-waxing complex under construction at the Omsk Lubricants Plant.
Berestovskaya wind farm
We are back in the "green" energy sector and are carrying out general contracting work on the construction of the Berestovskaya – 110 kV Berestovskaya substation.

MVS "Eltema Pro" for 4000 A
Our designers have successfully developed and tested an Eltema Pro control panel cell with a built-in 4000 A service trolley. The first contract for 50 cells was signed and shipped to the Customer early next year.

Grand opening of Parnas-2
On February 4, 2021, the new production complex was launched. We have transferred the production of modern innovative equipment to it: digital transformer substations, including for "green" energy, solar and wind power plants.

Solar power plant for Electronmash
The Electronmash solar station has been installed and connected to the system for its own needs. Now we use "green" technologies for ourselves.

Digital warehouse in Electronmash
Digital technologies help not only Customers, but we need digital technologies ourselves. To increase efficiency, we have implemented a digital warehouse using the automated warehouse management system WMS, installed elevator warehouses for storing components, implemented picker robots and packer robots, and changed the infrastructure for their smooth movement. The created warehouse ecosystem has significantly improved all considered performance indicators.

Participation in the national Labor Productivity project
Together with FCC experts, we have optimized and reengineered the main production processes and identified several main areas of improvement. These are changes in the processes of picking products and delivering them to the conveyor, optimizing the location of the machine park, which led to a reduction in moving time and provided an increase in productivity per unit of production.

The new production complex "Parnas-2" has been built
Investments in the construction of Russia's first modern production complex for the production of digital complete transformer substations and block-modular inverter installations for renewable energy amounted to more than 326 million rubles for JSC Electronmash. About 300 million more will be invested in retrofitting the new site.

Winner of the PAP-FOR Awards 2020
The PAP-FOR Awards are awarded to pulp and paper mills, manufacturers and suppliers of equipment and services for their successful contribution to the development of pulp and paper industry in Russia and the CIS. The successful operation of our equipment at the CBP facilities allowed us to become a laureate in the nomination "Energy Efficient equipment at the CBP enterprise".

Digital substation with centralized RPA 61850-9-2
The successful experience of creating digital substations using classical CPS technology allowed us to participate in the implementation of projects of digital substations with centralized control systems for Gazprom Neft PJSC.

Switches and disconnectors of 35 and 110 kV
By the end of 2019, we completed the formation of our own portfolio of high-voltage products for Outdoor switchgear 35 and 110 kV. The first delivery was made under an export contract to facilities in Kazakhstan.

A new generation of the control and monitoring system
The further planned development of our control panel monitoring and diagnostics system, the accumulated amount of requests for system development from systemusers led to the creation of a new generation of control panel control systems, which included video switching monitoring, updated contactless temperature control, and many other service and diagnostic functions.

Audit Saipem S.P.A.
Electronmash has passed a rigorous qualification audit of engineering, production and equipment quality processes conducted by the renowned EPC contractor Saipem S.P.A. The results of the successful audit were reflected in the supply of equipment for the sulfur production plant of Gazpromneft-MNPZ JSC.
We turned 20 years old
The company has achieved great financial success by this round date. We have friendly staff, excellent staff and a weighty portfolio of Orders.

Audit EPC Tecnimont S.P.A.
Electronmash has passed a rigorous qualification audit of engineering, production and equipment quality processes conducted by the well-known EPC contractor Tecnimont S.P.A. The results of the successful audit were reflected in the supply of equipment for the Delayed Coking Unit of Gazpromneft-ONPZ JSC.

Our equipment for Nord Stream 2
As part of the cooperation between Schneider Electric AG Berlin and JSC Electronmash on the production of equipment for power supply to the facilities of the Nord Stream-2 gas pipeline, the international commission noted its high quality and degree of safety during operation, reliability of design, ease of maintenance and compliance with Russian and international requirements.

Our equipment for Uzbekistan
We have entered into the most complex Oltin YO'L export engineering project in Uzbekistan. We participated in the Uzbekistan GTL international project together with engineers from various countries – China, India, Korea and Uzbekistan, and managed to meet all the diverse requirements of the project participants and the ENTER ENGINEERING general contractor in our products.
REC project "International Cooperation and Export"
Participation in the national project of the Russian Export Center "International Cooperation and Export" allowed the company's specialists to expand their export potential and ensure further productive activities in foreign economic markets.
Changing approaches to staff training
The development of computer technologies for machine learning of personnel has made it possible to revise the principles of organizing staff training and switch to interactive learning. It became especially noticeable how young employees easily adapt to our complex engineering tasks in this form.

Audit EPC KT-Kinetics Technology S.P.A.
The Electronmash company has passed a rigorous qualification audit of engineering, production and equipment quality processes conducted by the well-known EPC contractor KT-Kinetics Technology S.P.A. The results of the successful audit were reflected in the supply of equipment for Hydrogen and hydrocracking installations Lukoil-Nizhegorodnefteorgsintez LLC.

ESS "El Storage Home" in Lamberi
Our ESS "El Storage Home" are installed in the cottage village of Lamberi.

The trademark "El Storage" is registered
The development of various modifications of electric power storage systems has come to completion and received a registered trademark, from now on we have "El Storage Home", "El Storage Industry", "El Storage Hybrid".

Localization of equipment for wind turbines
The localization of wind energy equipment is provided for by the state program for the development and stimulation of generation based on renewable energy sources in Russia . Our company has successfully participated in this process, and now the converters localized at our enterprise are successfully operated at the Azov and Murmansk wind farms built by ENEL under the PDM program.

RNC CIGRE Membership
Our new developments in the field of energy storage and the use of ESS as part of energy systems have led us to join the national problem working group on the NIC C6 RNC CIGRE "Application and features of integration of electric energy storage systems into electric power systems".

The best digital project
The integrated software and hardware complexes "Control Monitoring and Diagnostics System" won the nomination "Best Digital Project" and received a diploma from PJSC ROSSETI signed by CEO P.A. Livinsky.

ISO 9001:2015 certification
The continuous improvement of the current quality management system allowed the company to implement and confirm the implementation of risk-based thinking in business process management to achieve the best results under constantly changing external and internal factors, which was confirmed by the ISO 9001:2015 certificate of compliance. Our company employs 300 highly qualified specialists.

ELM Inverter Power Station Novouzenskaya SES and Funtovskaya SES
ELM Inverter Power Station Electronmash has been successfully put into operation. Now we have a 15-year service contract with Hevel for the maintenance of solar power plant equipment.нций.

Upgrading production facilities
To ensure the maximum level of safety, automation and high productivity, the company's machine park has been significantly updated. Now we use only machines from recognized global industry leaders: Trumpf, Amada, and Shmaltz.

Audit of EPC Daelim Corporation
Electronmash has passed a rigorous qualification audit of engineering, manufacturing and equipment quality processes conducted by the renowned EPC contractor Daelim Corp. The results of the successful audit resulted in the supply of equipment for the Deep Oil Refining Complex of Gazpromneft-ONPZ JSC.

General contract for reconstruction
We have completed general contracting work on the reconstruction of the 110 kV substation in Tikhvin, where, in an industrial facility, we carried out a phased reconstruction of the facility, including a 10 kV substation, a DC system, a high-pressure heating system and automated process control systems.

Supply of DC Systemto facilities with CPS
Our DC System have been delivered to IDGC of the North-West facilities, including the experimental digital substation of PJSC ROSSETI with a centralized Lsis substation of 110/35/10 kV Yuzhnaya substation in the branch of Volgdaenergo.

MVS ELTEMA 35 kV with top-mounted arrangement of the busbar system
Having analyzed the needs of our Customers and the market of proposed solutions, we are starting to develop a modification of the MVS ELTEMA 35 kV with top-mounted arrangement of the busbar system with overhead busbars, which is especially effective with a large number of cable connections.
Audit by EPC Technip Italy S.p.A.
Electronmash has passed a rigorous qualification audit of engineering, production and equipment quality processes conducted by the well-known EPC contractor Technip Italy S.p.A. The results of the successful audit were reflected in the supply of equipment for power supply and the technological complex of Gazpromneft-ONPZ.
The first wind farm in the Russian Federation
Electronmash participated in the construction of the first wind farm in the Russian Federation and installed eight PS receiving power from wind turbines for the Ulyanovsk WPP of PJSC Fortum.
Electronmash is ABB's best partner in the industry
Following the results of 2016, JSC Electronmash was awarded the ABB Diploma in the nomination "Best Partner in Industry".

ISO 14001:2004 certification
The company's environmental management system is fully compliant with the requirements of the international standard ISO 14001:2004. The audit confirmed the company's commitment to reducing the environmental impact of production and the effectiveness of organizational measures carried out by Electronmash aimed at improving environmental protection activities.

OHSAS 18001 Certification:2007
Obtaining the OHSAS 18001:2007 Certificate of Conformity is a confirmation of compliance of the occupational safety and health management system implemented in the company with the requirements of GOST R 54934-2012/OHSAS 18001:2007 "Occupational Safety and Health management Systems".

Green energy from Electronmash
The company is far from indifferent to what our planet will be like for our children. Realizing the prospects of using renewable energy, we started developing our own products for green energy – block-modular inverter installations for solar power plants, grid energy storage devices for solar power plants, wind farms, ASUE and other industrial applications.

Implementation of the 5S principles
The 5S system is five simple principles of rational organization of the workspace, by implementing and observing which we were able to maximize the benefits of available resources. The 5S system is successfully used not only in the production area, but also in engineering offices, allowing us to significantly increase labor productivity.
"Special" 110 kV substation "Chikshinskaya"
Import substitution at Gazprom led us to the need to complete the working documentation and ensure the supply and commissioning of KTPB entirely from domestic components, including absolutely all elements of secondary systems and automation (automated process control systems, SCADA, field components and network-forming structure).

Medium voltage switchgear monitoring and control systems for Gazpromneft
Our 6 kV MVS and monitoring systems have proven themselves well at Gazpromneft facilities. The successful implementation of MVS and Medium voltage switchgear monitoring and control systems for Gazpromneft allowed us to successfully move on to digital substation projects in the future.

PS-ELM with integrated automation for Gazprom's ZKPT
For the PS of the Condensate Preparation Plant for Transport under construction Gazprom PJSC has successfully implemented our standard solution for distributed information input inside the CTP with the interaction of all systems according to the IEC 61850 protocol, made on a Russian element base - from now on there will be no centralized I/O and no single brand in automation.
ROSSETI's letter of thanks
The delivery of high-quality equipment for the Lenenergo substation in a short time was appreciated. ROSSETI's letter of thanks to us highlights our efficiency, professionalism and customer orientation.

35 kV PS for difficult operating conditions
Our 35 kV PS are shipped via winter routes to our Customers – we must provide for everything from difficult transportation conditions to difficult installation and operation conditions.

LVS with IEC 61850-8-1
Our Customers are beginning to actively implement IEC 61850 not only for MMS, but also for GOOSE. By order of TGK-1, we manufactured a LVS for the ES-1 Central Thermal Power Plant in Saint-Petersburg. At that time, it was the first industrial implementation of ABB EMAX 2 switches with IEC 61850 of this scale in Russia.

MVS "Eltema Pro" 6-10 kV
In order to ensure the possibility of carrying out routine maintenance on the entire section of the control room at the same time, we developed in the shortest possible time a widely demanded modification of the Eltema cell with an integrated trolley, which later became known as the Eltema Pro control room. The first cells of the new series were installed at the Novolipetsk Metallurgical Plant during the overhaul of blast furnace shop No. 2.

MLSP Prirazlomnaya - Gazprom Neft Shelf LLC
According to the technical requirements, we have manufactured equipment for the power supply of heating systems for the Prirazlomnaya offshore ice-resistant stationary platform (MLSP). Our equipment was awarded the diploma "The best company in the group of Energy Equipment for offshore development in 2014".

Equipment in tropical design
As part of the construction of an iron smelter in the Republic of the Union of Myanmar under an export supply contract, our equipment received a modification for a tropical climate. Our engineers performed a complex of commissioning works at the Customer's facility in the Republic of the Union of Myanmar.

Implementation of the PLM system
The implementation of the PLM product lifecycle management system has significantly optimized the company's production workflow, and its integration with 1C has provided a unified information space for all product manufacturing processes.

Control system of the pump unit control complex
For the first time, we have completed the supply and commissioning of the control complex for pumping units of the Yarudeyskoye field of YARGEO LLC. For us, this was the first delivery of not only power supply components, but also a complex technology management system, which we completed on a turnkey basis.

Audit «AIR LIQUIDE»
Electronmash passed the AIR LIQUIDE audit and was recognized as a qualified supplier of power supply equipment for the AIR LIQUIDE group of companies.
Audit of EPC «Linde Group»
Electronmash has passed a rigorous qualification audit of engineering, production and equipment quality processes conducted by the renowned EPC contractor LINDE Group. The results of the successful audit resulted in the supply of equipment for the power supply of industrial gases to Linde Gas Rus JSC in Dzerzhinsk.

Registration of an electrical laboratory in Rostechnadzor
To ensure the high tender and qualification requirements of our Customers, our electrical laboratory was registered with Rostechnadzor.

Innovative substation 35/6 kV "Monetnaya" (KTPM 1868)
Electronmash has successfully acted as a designer and supplier of unique equipment for innovative digital facilities of PJSC Lenenergo as part of the development of the Petrogradsky District power supply scheme. The first complete 35/6 kV substation with a capacity of 25 mVA in a concrete shell with integrated automation, made according to the standards of the electric grid complex for JSC Lenenergo, was commissioned in 2014.
General contracting projects
The accumulated experience in manufacturing equipment and the high engineering potential of the company allowed us to enter into general or partial contracts with the development of working documentation, supply of equipment, construction, installation and commissioning for several facilities, such as the reconstruction of the PS for Voronezhsintezkauchuk, the new KTPM and the reconstruction of existing facilities for Lenenergo.
DC System «ExOnSys»
We have carried out a complete revision of the products of direct current design solutions, a significant amount of typing and unification has been performed, special algorithms for DC panel and sound have been prepared, and a monitoring and control system for SOPT has been developed. All this resulted in the creation of a unified product of DC System "ExOnSys".

PS ELM 35 kV
The creation of our own 35 kV MVS cell allowed us to continue our design work, carry out the necessary certification and enter the 35 kV MVS supply market. The first 35 kV substation provided power to SOLLERS-Far East, the first automobile plant in Primorsky Krai.

Participation in the 20th anniversary exhibition "Electrical Engineering 2013"
The company participates in the 20th anniversary international exhibition "Electrical Engineering 2013" in St. Petersburg. Our equipment and technological solutions receive the first place in the nomination "Electric Machines and Equipment" of the competition for the best Russian innovative technological solutions and equipment in the energy sector.

Development of the Eltema Light MVS
The development of the 6-10 kV Eltema Light MVS has been completed, and contracts have been signed for the first deliveries of Eltima Light control unit cells to the newly built Tikhvin CHPP.
EPC Dresser Rand S.A. France
Our company has successfully passed the audit of the French company Dresser Rand S.A. within the framework of the LSP-1 MLSP project named after V. Filanovsky. In cooperation with Dresser Rand, which is responsible for the gas compressor equipment of the technological part of the platform, we supplied control panels and MVS in marine design.

The exhibition "Surgut. Oil and Gas - 2012"
Diploma for the first place to the winner of the Best equipment, technologies and services presented at the Surgut International Exhibition. Oil and Gas - 2012".

Joining the SRO of designers
More and more often, our customers offer us a full range of work, including not only installation and commissioning supervision, but also the development of working documentation. To ensure our participation in such projects, we join the SRO "Injspetsstroy-Project". The company's staff grows to 250 people.
Gazprom's Certificate of Conformity assessment for MVS and LVS
Having passed all the necessary tests, we received a Certificate of Conformity assessment of power equipment with Federal Standards of Industrial Safety and operating conditions at Gazprom facilities. Now our LVS and MVS equipment can be used in equipment selection procedures and applied at Gazprom facilities, taking into account the specifics of the production facility.

MVS "ELTEMA+" 35 kV
The design team has started developing a 35 kV ELTEMA+ MVS with a lower busbar arrangement. As a result of the design development, a unique 35 kV with high technical, weight, size and operational characteristics was created at that time, which passed all the necessary tests of the Scientific and Technical Center of JSC STC Electric Power Engineering from the first announcement.

Equipment for the Krasnaya Polyana ski complex
Our block-modular transformer substations have been installed at the most important facilities under construction for the upcoming Sochi 2014 Olympics.

Office and production complex "Parnas-1"
We have moved to a new complex on Parnas, specially designed for the needs of our production, equipped with all the latest technological achievements. By the end of the year, the Electromash team consisted of 150 people.

Implementation of a lean manufacturing system
In order to increase the company's competitiveness by regularly identifying and eliminating losses in business processes, to improve the manageability and flexibility of the company, improve the quality of equipment produced by the company and reduce costs, a Lean Manufacturing System was introduced. The production of equipment has been digitized and transferred to the conveyor production principle.

Joining the Builders' SRO
To participate in major projects of our customers, the company joins the SRO NPKSK Soyuzpetrostroy-Standard and receives a certificate of approval for installation, commissioning and commissioning.
Certification of PJSC ROSSETI
The company has received a positive Conclusion from the certification commission of JSC FGC UES for DC System and MVS of 6-10 kV. The company's equipment was included in the register of certified equipment of JSC FGC UES.
Software CadEL
The increased volume of Customer requests, the volume of preliminary design and the launch of orders into production required the company to partially automate these processes. To solve this problem, we have developed our own CafEL software, which provides the possibility of self-configuration by the user.

Partnership Agreement with JSC FGC UES
JSC FGC UES and CJSC Electronmash have signed an agreement on mutually beneficial cooperation between the parties in the supply of products manufactured by CJSC Electronmash to the facilities of JSC FGC UES.
We turned 10 years old
The company has turned 10 years old, we are completing the construction of the new production complex "Parnas" and are preparing to move, and we also invite all our friends to the first serious anniversary of the company.

ELM PS
Our designers have typed complete transformer substations ELM PS not only in the workshop, but also in block-modular buildings.

The exhibition "Surgut. Oil and Gas – 2009"
The company tries its hand at industry exhibitions. We participate in the IV international exhibition "Surgut. Oil and Gas – 2009" with a full set of our equipment, including process control panels on extendable modules. At this exhibition, our equipment earned the Diploma of the winner of the contest "The best equipment, technologies and services presented at the IV International exhibition: Surgut. Oil and Gas – 2009" in the nomination "Electrical products and equipment. Energy and resource-saving technologies".

Certification of Gazprom PJSC
The equipment of the Electronmash company has passed the industry certification of Gazprom PJSC. The first delivery of equipment corresponding to the certificates received was a set of equipment for the Sheksninskaya compressor station, one of the seven stations of the North European gas pipeline on the Gryazovets-Vyborg section.

Gold medal for the "ExOn" and the diploma of the LVS Assol GRAND PRIX
Наше оборудование низкого напряжения получило широкое признание энергетиков, что выразилось во все растущем количестве заказов. Компания участвует в своей первой международной выставке «Электро-2008». Нам было особенно приятно получить золотую медаль на 17-ой международной выставке «Электро-2008» в Москве за образец шкафа оперативного тока (ШОТ) «ExOn» и диплом ГРАН-ПРИ за высокие показатели качества низковольтному комплектному устройству (НКУ) «Ассоль».

MVS «Eltima» 6 (10) kV
The development of the 6-10 kV Eltema cell has been completed, and tests have been successfully conducted at the Scientific Research Institute of High-Voltage Equipment Engineering (JSC NIIVA). An agreement has been signed for the first supply of Eltema control panel cells to the facilities of the Lyantorskoye field.

Creation of LLC "Electronmash Engineering"
A specialized company, LLC Electronmash Engineering, was established to design and manufacture 6-35 kV equipment, and the best professional design engineers from St. Petersburg were invited to join its team. The team set a goal to create a series of 6-35 kV MVS as soon as possible, covering all possible applications in industry and energy.

The RMRS certificate has been received
Obtaining a certificate of type approval from the Russian Maritime Register of Shipping at LVS Assol ensured our participation in important projects involving the installation of equipment on offshore shelves. And in the same year, our first offshore equipment was installed on the ice-resistant stationary platform LSP-1 for the Y. Korchagin field.

Exclusive partner status of ELSTEEL
The significantly increased sales of LVS Assol allowed us to obtain the status of an exclusive trading partner of ELSTEEL.

Staff of 50 people
The newly opened opportunities for our company allowed us to increase the number of staff. The company's staff consisted of 50 highly qualified, motivated, and ready-for-new-successes employees.

ABB Certification
The successful sales of our low-voltage devices to provide process control to our Customers allowed us to become an official ABB partner in frequency drives and confirm our competence from ABB in the design and development of low-voltage equipment.

Rostechnadzor's permission to use
After successful acceptance tests and passing the industrial safety examination, the company's products received Permission from Rostechnadzor to use the equipment at particularly hazardous facilities.
Exclusive trading and service partner of GBE SPA
GBE SPA has chosen us as its exclusive trading and service partner. As part of the joint activity, service and engineering personnel were trained, T3R transformers were certified in the Russian Federation, and a service center began operating.

Rostechnadzor Atomic License
The company has received an Atomic license to design equipment for nuclear installations. The first equipment designed under the obtained atomic license was delivered to the Leningrad NPP.
Certification for participation in tenders of Transneft
An extended audit was conducted by Transneft specialists and the company was admitted to participate in the Transneft tender procedures.
DC panel «ExOn»
The design department of the company has developed an operational DC panel under the trade brand "ExOn". The main consumers of this product are companies in the oil and gas sector. Our first cabinet is installed at the facilities of PJSC Tatneft.

ISO 9001:2000 certification
The company's active activity aimed at creating an effective and stable management system for Electronmash has led to the fact that we have been able to successfully implement and certify the current quality management system for compliance with the requirements of the international standard ISO 9001:2000, which indicates the company's focus, first of all, on the needs of its Customers and increasing their satisfaction, the use of process and system an approach to business management, control of all business processes, and management decision-making based on the analysis of the data obtained.

License for the design and construction of buildings and structures
To ensure participation in complex engineering projects, the company has obtained all the necessary building permits and licenses.

Certification of NKU "Assol" 0.4 kV
All necessary certification tests were carried out to ensure the sale of equipment under the registered trademark "Assol". The technical specifications (technical specifications) for LVS Assol were entered into the Unified data bank (DB) "Products of Russia". The individual registration number of LVS Assol is 017406.

Partnership agreement with ELSTEEL
A partnership agreement on mutually beneficial cooperation has been signed with the Danish company ELSTEEL. Together, we have started adapting the ELSTEEL extendable modules for use as part of the Assol LVS.
Schneider Electric Partner Certificate
The company's staff has passed all the necessary qualification levels of training, the volume of purchased components for completing LVS shields has reached the required level, and we have received the Schneider Electric partner certificate.

LVS "Assol" 0.4 kV
The company's design department has developed a universal low-voltage complete device under the brand name Assol.

Electronmash production Complex
As a result of intensive commercial and engineering activities, the company was able to afford to purchase its own production and office building with a total area of 2000 square meters. meters on Tikhoretsky Prospekt, which allowed it to reach a fundamentally new level of production of electrical equipment.

Reconstruction of the Tyumen Oil Company
As part of the reconstruction of the Tyumen Oil Company, we carried out engineering and supplied a set of electrical equipment for the reconstruction of the hydrocracking plant.
The first main switchboard 630A
The first switchgear in the newly created workshop was put into operation at Syktyvkar LPC and is currently in operation.
The first partnership agreement with ABB
A partnership agreement has been signed with ABB regarding cooperation on 0.4 kV equipment. In cooperation with ABB, the engineering and design staff was trained.
Oil production pump control stations
The company's young engineers have developed an oil production pump control station, which has been put into trial operation at the facilities of Surgutneftegaz JSC.

Opening of the first LVS assembly production site
Even small projects require hardware implementation, and as a result of the feasibility study, it was decided to create its own electrical engineering production.

Organization of the Electronmash engineering company
In 1998, young promising engineers combined their potential to create an engineering company in the field of industry and power supply technology, which later became widely known as a high-quality manufacturer of electrical equipment and a reliable partner for any engineering tasks from design and calculations to the construction of power facilities.

Small projects in the field of instrumentation and technology
A cataloger for control and measuring devices was created, and sales of instrumentation and technological automation projects were actively developing.