Gazpromneft-ONPZ
Customer: Gazpromneft-Energoservice LLC
: 2023
Region:
: Oil, Gas and Petrochemistry- development and supply of complete block-modular transformer substations;
- integration of an electric energy storage system based on supercapacitors into a substation;
- integration of new equipment into the existing energy infrastructure of the Omsk Refinery;
- performing a full range of installation and commissioning supervision work;
Energy supply modernization project
- 4 × 2BKTP-ELM-2500/6/0.8-UHL1 are block modular transformer substations with a capacity of 20 MVA.
- 1 × 3BKTP-ELM-2500/6/0.4-UHL1 is a block modular transformer substation with a capacity of 7.5 MVA
Technical solutions
As part of the Omsk Refinery's energy supply modernization project, the concept of using an electric energy storage system and the basic requirements for a technical solution were formulated by Gazpromneft-Energoservice LLC, which acted as the general contractor for the project. JSC Electronmash participated as a contractor and supplier of equipment, and also assisted in the design and implementation of technical solutions in accordance with the specified requirements.
Electronmash has manufactured and supplied a complex of block-modular transformer substations that provide power supply to the facility and the integration of new equipment into the existing energy infrastructure of the Omsk Refinery.
As part of the facility's power system, ESS is implemented on the basis of supercapacitors. This equipment is designed to control the flow of electrical energy, improve the reliability of power supply and the efficiency of the power system.
To ensure the integrated operation of the equipment in the substations, the Eltema 6 kV MVS, 2500 and 160 kVA power transformers, the Assol 0.4 kV LVS, the ExOnSys S-series control panel and the automatic control system cabinet were used.
The ESS elements are controlled by means of an ACS cabinet, which provides centralized control and management of equipment, as well as the implementation of specified system operation algorithms.
Electronmash performed a full range of work on the implementation of its part of the project, including equipment design, manufacture, supply, installation supervision and commissioning.
2022
MOC Ozerny
2021
GEF-2
2023
PS 110/35 kV SPP "Laganskaya"